Supplying formwork to a restaurant belonging to a global fast-food chain

Supplying formwork to a restaurant belonging to a global fast-food chain

About the project

Building a global fast-food restaurant chain requires precision, strict adherence to deadlines, and concrete surfaces of impeccable quality. Budhub has extensive experience in this field, having already completed work on more than 10 locations for the chain throughout Ukraine.

  • Project type:
    commercial construction
  • Location:
    Bukovel, Ivano-Frankivsk Oblast
  • Total formwork area:
    1660 m²
  • Special feature:
    winter construction in mountainous conditions

Customer Inquiry

The client needed to implement a technically complex project involving a large number of different types of columns and a complex Floor slab structure, including a system of reinforcing beams. The key requirements were a flawless concrete finish and minimal deviations from the design specifications for the monolithic work (permissible deviations of only 1–3 mm).

Challenges

The main challenges were the limited space for equipment to maneuver on the site. Since the work was carried out during the winter, it was critically important to ensure continuous heating of the concrete in accordance with DBN standards.

  • Area of horizontal formwork: 950 m²
  • Vertical formwork area: 460 m²
  • Shoring props: 1,000 pieces
  • Permissible tolerances: 1–3 mm
Engineering Support and Temperature Monitoring 


To address these challenges, we developed a customized formwork layout. In particular, due to the complex multi-level structures with formwork beams, the number of shoring props was significantly increased—over 1,000 telescopic props were used across an area of approximately 700 m², ensuring the structure’s necessary load-bearing capacity under high loads. Along with the formwork assembly, we leased concrete heating transformers (TMO) and provided on-site supervision for their installation and connection. 

A
Versatile Set of Equipment and High-Quality Deck


To achieve a high-quality concrete surface, we equipped the site with new plywood. Additionally, we provided the site with a complete set of high-quality consumables. Pipes, cones, and clamps ensured proper installation and strict adherence to the protective layer. Furthermore, the use of professional release agent ensured a perfectly light-colored and even concrete finish.

Logistics Optimization

The
construction site had limited maneuvering space. Our team organized direct delivery without any intermediate transshipments: we used agile 5- and 10-metric-ton trucks that drove right up to the required sections of the facility. This significantly reduced the client’s logistics budget and allowed us to stay well within the resort’s operational “windows” (deliveries between 6:00 and 7:00 a.m. or in the evening).

Equipment used

The Budhub team supplied the site with a complete set of formwork—from the foundation to complex floor slab systems—including concrete heating equipment, and organized logistics using maneuverable transport directly to the site. 

  • Horizontal formwork:
    950 m²
  • Shoring system:
  • area 250 m²
  • Vertical formwork:
    460 m²
  • Special equipment
  • transformers for concrete heating (TMO)
  • Consumables
  • (water-based formwork lubricant, cones, tubes, plugs, fasteners, make-up plywood)

Result

Thanks to Budhub’s experience in managing projects for a global fast-food chain, we provided formwork in accordance with the plan. The concrete pour was completed with minimal deviations from specifications, and the client achieved the most efficient use of resources during the Logistics and materials handling phases.

Latest news Budhub