The Budhub H20 EU Top formwork beam features beveled, solid-cast polyurethane ends that eliminate the risk of gaps, prevents cracks and chips, and provides additional protection against moisture, making the beam durable in use.
The European standard EN 13377:2002 guarantees the safety and quality of the work performed, and the optimal weight ensures ease of installation.
Budhub H20 EU Top Horizontal Formwork Beam
- Country of origin: Austria
- Brand: Будхаб
Product characteristics
- Condition Used, New
- Size 1.8 m, 2.45 m, 2.65 m, 2.9 m, 3.3 m, 3.6 m, 3.9 m
- Country Austria
- Series H20 EU Top
Product description
Do you need advice?
Our engineers will prepare an engineering layout for your project and calculate the exact cost of renting the equipment.
You may be interested in
Projects
Often we are
〔 asked 〕
How much does it cost to rent formwork for floor slabs?
The average rental cost for a set of horizontal formwork is 12 UAH per square meter per day.
The set includes: beams, posts, crowns, tripods, and laminated plywood.
What factors affect the cost of renting floor formwork?
The cost of renting floor formwork depends mainly on the height and thickness of the floor slab. In addition, the rental cost is affected by the presence of additional load-bearing beams, as well as the presence of walls and partitions.
How much does it cost to rent vertical formwork?
The average rental cost for a vertical formwork set is 30 UAH per square meter per day. The set includes panels, nuts, tie rods, braces, and all other necessary components.
How much does laminated plywood cost?
The price for one sheet of laminated plywood starts at 2,070 UAH. The cost depends on the country of origin and the thickness of the sheet.
Is it possible to rent laminated plywood for formwork?
Yes, we rent out plywood for formwork.