About the project
Comprehensive supply of formwork for the construction of a 3-story multifunctional complex that combines logistics and warehouse facilities, administrative and office space, and a demonstration and exhibition area.
The project is located on the Lviv bypass (in the village of Sokilnyky) and is characterized by the highly complex geometry of its structural framework, as well as ceilings at varying heights.
- Project type:
Office and warehouse complex - Total weight of equipment:
73.3 metric tons - Year:
2026 - Location:
Sokilnyky village, Lviv Oblast

Customer Inquiry
The request was to provide a full-cycle supply of formwork systems for the concrete pouring of a 3-story monolithic frame with high-rise and long-span floors. The client needed equipment capable of operating at heights ranging from 5 to 9 meters, with the option to optimize costs by combining rental and purchase of materials.
Challenges
The construction of the facility involved a high degree of engineering complexity due to the varying ceiling heights and the combination of commercial and warehouse areas. The formwork system had to withstand significant loads during the concrete pour for the high first floor and ensure stability in the complex section of the second floor, where the height reached 9 m.
The situation was complicated by tight deadlines and the need to pour concrete in sections using a shoring system without slowing down the overall pace of construction.
For the upper section of the second floor, we designed and installed the Doka Staxo 40 tower scaffolding system, which provides increased load-bearing capacity, structural stability at significant heights, and safe working conditions.
For the 1st and 2nd floors, we installed telescopic props (Doka Eurex, PEP, Ulma, Budhub EU) with spans of up to 4.5 m and 5.5 m, which allowed us to span high clearances without slowing down the installation process.
To form the surface of the floor slabs, 70 m² of Budhub Class A film faced plywood (1250×2500×21 mm) was supplied.
We leased the specialized Staxo high-rise towers and additional support elements, while we sold the materials intended for long-term or permanent use (film faced plywood, H20 beams) under purchase and sale agreements.
Equipment used
The Budhub team supplied the site with a complete set of horizontal and vertical formwork, as well as Doka Staxo 40 shoring systems for pouring complex high-rise segments. We supplied Budhub with new Class A film faced plywood to ensure a high-quality concrete surface and organized the efficient logistics for 73.3 metric tons of equipment within the customer’s schedule.
- Horizontal formwork: 40.53 metric tons
- Shoring system: 70 m²
- Vertical formwork: 25.78 metric tons
- Film faced plywood: 70 m²
Technical Drawings
Result
Thanks to precise engineering calculations and the combination of telescopic props with Doka Staxo 40 support towers, complex high-rise sections (up to 9 m) were poured. The client received a monolithic frame for an office, warehouse, and exhibition complex, with all deadlines and safety standards met.







Frequently Asked Questions (FAQ)
1. What types of projects do you supply with equipment?
We equip projects of any scale and complexity: from private residential construction to large-scale infrastructure, commercial, and industrial facilities.
2. To which regions do you deliver?
We supply equipment throughout the entire territory of Ukraine. Thanks to our own fleet and well-established logistics, we deliver equipment directly to your construction site.
3. What exactly does your comprehensive approach include?
Our comprehensive approach covers:
Engineering calculation: precise determination of the required quantity and specification of equipment based on your drawings.
Logistics management: timely delivery to the site and removal upon completion of the work.
Service maintenance: professional cleaning, damage assessment, technical support, and equipment repair.
4. Which formwork is best to use for high-clearance slabs (e.g., 9 m)?
For high slabs, we recommend using specialized frame shoring towers, such as Doka Staxo 40. This system ensures maximum stability and can withstand heavy loads (up to 40 kN per leg). Standard telescopic props are not suitable for such heights due to safety and load-bearing capacity considerations.
5. Up to what maximum height is it safe to use telescopic props?
Telescopic props (such as Doka Eurex, PEP, or the Budhub EU line) are designed for efficient operation at heights up to 4.5-5.5 m. If a project involves higher slabs, engineers recalculate the loads and plan a transition to a shoring tower system.
6. Is it possible to combine an order: rent a part of the formwork and buy the rest?
Yes, this is a common and economically viable practice. You can rent shoring elements (e.g., Staxo towers) for specific tasks and purchase universal, long-lasting materials (film-faced plywood, H20 timber beams) to own and use on future projects.
7. Where is your warehouse located, and do you supply equipment in the Lviv region?
The Budhub warehouse is located in the Lviv region, allowing us to handle logistics to sites within the region in the shortest possible time. At the same time, we have experience equipping large-scale projects and provide equipment for rent throughout the entire territory of Ukraine. Specifically, for this complex in Sokilnyky, we delivered 73.3 tons of equipment.